范文字数:21100,页数:67 600MW发电机组自动装置整定计算及仿真 摘 要 针对 600 MW发电机组自动装置,最初分析初始材料,从而确定了电气主接线,然后进行了短路点的电流计算,再对发电机组自动装置进行配置,采用了先进的DGT801、pss660、WBKQ-01B等设备,并对各个装置进行整定计算,鲜明的突出了各个保护的特点,以求在配置和整定值上满足大机组对保护选择性、灵敏度和可靠性要求。 关键词 发电机组,自动装置,整定计算,快切,仿真 Abstract In view of 600 MW generators automatic device, first analyzes the initial material. Thus has determined the electrical main wiring. Then carried on short-circuited the electric current computation, according to calculate the result of to choose the electricity equipments. Has used the advanced equipments of the name DGT801、pss660、WBKQ-01B. and carry on to the each protection whole protective settle the calculation, fresh and clear and outstanding the characteristics that each one protect,It is used to meet the requirements of big unit set for selectivity , sensitivity and reliability in configuration and setting. Key Words generator-transformer unit ,Automatic device,setting calculation , high- speed switch, simulation 目 录 摘 要 I 点击下载:
![]()
|