范文编号:JX276 所有图纸,外文翻译。范文字数:39943.页数:119 摘 要 采煤综合机械化,是加速我国煤炭工业发展,大幅度提高劳动生产率,实现煤炭工业现代化的一项战略措施。综合机械化不仅产量大,效率高,成本低,而且能减轻笨重的体力劳动,改善作业环境,是煤炭工业技术的发展方向。而液压支架是综合机械化采煤方法中最重要的设备之一。 关键词:液压支架; 支护; 四连杆机构; 顶梁; 掩护梁; 液压支柱或者支柱; 结构设计.
ABSTRACT The comprehensive mechanization of coal mining is the zcceleration coal industrial development of our country , raises labor productivity substantially, realizes the modern a strategic measure of coal industry. Synthesize mechanization not only output big, efficiency has low cost high and can alleviate heavy physical labor and improvement working environment, is the technology of coal industry develop direction. Hydraulic support is one of the comprehensive most important equipment in the mechanization method of coal mining. Keywords: hydraulic support; shoring; 4 linkage mechanisms; canopy; caving shield; hydraulic legs or props; structure design.
目 录 4.1.1液压支架工作状态 ………………………………………………………52 4.1.2计算载荷的确定 …………………………………………………………52 4.2 液压支架的受力分析与计算 ……………………………………………53 4.2.1支架整体受力分析 ………………………………………………………55 4.2.2顶梁的受力分析与计算 …………………………………………………56 4.2.3掩护梁的受力分析与计算 ………………………………………………59 4.2.4底座的受力分析与计算 …………………………………………………61 4.3 顶梁载荷分布………………………………………………………………62 4.4 底座接触比压………………………………………………………………63 5液压支架的强度计算……………………………………………………………67 5.1 强度条件……………………………………………………………………67 5.2 液压支架的强度校核………………………………………………………68 5.2.1前梁强度校核 ……………………………………………………………68 5.2.2主顶梁强度校核 …………………………………………………………72 5.2.3底座强度校核 ……………………………………………………………78 5.2.4掩护梁的强度校核 ………………………………………………………82 5.2.5 前连杆强度校核及对应销轴……………………………………………86 5.2.6 后连杆强度校核及对应轴校核…………………………………………87 6 液压支架的液压系统 …………………………………………………………89 6.1立柱和千斤顶………………………………………………………………89 6.2支架液压阀…………………………………………………………………90 6.2.1 液控单向阀………………………………………………………………91 6.2.2 安全阀……………………………………………………………………91 6.2.3 操纵阀……………………………………………………………………91 6.3液压支架液压原理图………………………………………………………91 6.4液压支架的控制方式………………………………………………………92 6.4.1 手动控制…………………………………………………………………92 6.4.2 自动控制…………………………………………………………………93 6.5液压系统安装、调试、保养………………………………………………93 6.5.1 安装 ……………………………………………………………………93 6.5.2 调试 ……………………………………………………………………95 6.5.3 保养 ……………………………………………………………………96 结论 ………………………………………………………………………………98 参考文献 …………………………………………………………………………99 翻译部分 ………………………………………………………………………101 英文原文 …………………………………………………………………101 中文译文 …………………………………………………………………108 致谢 ……………………………………………………………………………120
|
上一篇:P—90B耙斗装岩机 | 下一篇:耙斗装岩机设计 |
点击查看关于 ZFS15000-2035低位放顶煤液压支架设计 的相关范文题目 | 【返回顶部】 |