范文编号:ZD788 范文字数:17444,页数:53 有开题报告和任务书 中文摘要 在我国低压配电网大都采用中性点不接地方式运行,在分支繁多、接线复杂的树状配电网中,单相接地故障是发生机率最高的一种故障。虽然发生单相接地故障,但线路的线电压不变,对负荷连续供电没有多大影响,所以规程允许中性点不接地系统在发生单相接地故障后继续运行1~2 h,不必立即跳闸。但是单相接地后,其他两相非故障相电压升高倍,尤其是弧光引起的过电压极易造成两相或三相短路事故,长时间弧光电流引起局部过热,则可能导致架空线路烧毁,所以应迅速查找并排除接地点,提高系统的供电可靠性。由于单相接地故障情况复杂,接地电流小,给单相接地故障的探测带来了很大的难度。 Abstract Neutral non-effectively grounded systems and resonant grounded systems are widely adopted in power distribution networks in China, and the phase-to-earth fault happens most frequently in power distribution networks. Since the line voltage is still symmetrical under fault conditions, the systems can keep operating for one or two hours. However long-time earthing operation will result in two-point, more seriously, multipoint earthing fault as well as ground arcing fault caused over voltage. It will destroy the systematic safe operation. Thus how to detect the fault line quickly and accurately is an important issue in power system protective relaying, which has not been solved completely. 目 录 10kV输电线接地故障仿真平台相关范文 |
上一篇:福佳商城1号楼电气照明设计 | 下一篇:单台电梯PLC控制系统的总体设计 |
点击查看关于 10kV 电线 接地 故障 仿真 平台 的相关范文题目 | 【返回顶部】 |