XCLW33332 红树湾项目施工阶段成本管理研究 (字数:16788)摘 要在当前日益激烈的市场竞争条件下,建筑市场的价格压得很低,利润空间越来越小,因此加强工程项目的成本管理就成为建筑企业管理的重中之重。但是造价控制体制还处在起步阶段,还在慢慢的摸索着前进。进入市场经济时期,许多国外先进的造价控制理论思想、控制..
XCLW33332 红树湾项目施工阶段成本管理研究 (字数:16788) 摘 要 在当前日益激烈的市场竞争条件下,建筑市场的价格压得很低,利润空间越来越小,因此加强工程项目的成本管理就成为建筑企业管理的重中之重。但是造价控制体制还处在起步阶段,还在慢慢的摸索着前进。进入市场经济时期,许多国外先进的造价控制理论思想、控制方法引入到我国,在新的管理模式下,造价控制开始健全、科学化。目前国内的很多企业造价控制的都很好,在取得利润的同时也为社会节约了资源。控制工程造价不单要避免资金超过限额,更重要的是要提高各项资源的使用率,让有限的资源发挥更大的作用。施工阶段是由图纸转化成实体的关键阶段,变化因素复杂,细微的改变可能就导致大量成本浪费,造成成本失控。施工阶段造价控制与其他阶段的联系十分紧密,本文采取合理的措施,解决项目中存在的影响造价的问题,对施工阶段工程造价实施有效的控制,降低成本。凭借对A公司以往造价失控项目的经营情况进行研究,发现在项目中存在合同管理不善、现场施工管理混乱等问题。从项目整体考虑,深入探讨影响施工阶段造价的各个因素,着重分析施工组织设计、工期、工程变更等因素的影响作用提出系统的控制方法,实现对造价的有效控制这一目标。 关键词: 造价控制;施工阶段;红树湾 Abstract In today's increasingly fierce market competition, the construction market price is very low, the profit space is getting smaller and smaller, so to strengthen the cost management of construction projects has become the top priority of the construction enterprise management. But the cost control system is still in the initial stage, is still slowly groping forward. Enter the market economy period, many foreign advanced cost control theory, control method is introduced to our country, in the new management mode, the cost control began to sound, scientific. At present, many domestic enterprises cost control is very good, in the profits, but also for society to save resources. Control project cost is not only to avoid capital exceeding the limit, it is more important to improve the utilization of the resources, so that limited resources to play a greater role. Construction phase is the key stage of the transformation from the drawings into the entity, the change of the factors are complex, subtle changes may lead to a large number of costs, resulting in cost control. Cost control in the construction stage and the other stages have very close connection, this paper adopts reasonable measures, to solve the problem existing in the project cost of, the implementation of effective control of the construction phase of the project cost, reduce the cost. By virtue of the A company in the past cost out of control project management situation, found that the project exists in the contract management, site construction management confusion and other issues. From the project overall consideration, deeply discuss the influence the construction phase of the cost of each factors, focuses on the analysis of the effect of construction organization design, time limit for a project, engineering change, such as factors system control method is put forward, and achieve the aim of effective control of cost. Keywords: cost control; construction stage; mangrove bay 目 录 第1章 绪论 1 1.1课题背景及目的 1 1.2国内研究状况 2 1.3课题研究方法 3 第2章 施工阶段工程造价控制的基本理论 4 2.1工程变更管理与合同价款调整 4 2.1.1工程变更的管理 4 2.1.2工程变更价款的计算 4 2.2工程索赔管理与索赔费用的确定 4 2.3工程进度款的管理 5 2.4加强施工阶段的造价控制 6 第3章 红树湾项目的施工阶段工程造价管理 8 3.1工程概况 8 3.2成本管理组织安排 8 3.3成本管理措施 10 3.3.1及时办理工程签证 10 3.3.2加强材料费用的控制管理 10 3.3.3实施主动控制 11 3.3.4施工阶段的进度控制 11 3.4加强施工现场管理 12 3.4.1现场签证、变更对造价的影响 12 3.4.2现场签证、变更遵循的原则 12 3.4.3严格控制设计变更 13 3.4.4规范签证管理措施 13 结 论 14 参考文献 15 致 谢 16 红树湾项目施工阶段成本管理研究相关范文 |
上一篇:浅议青龙湖工程项目质量控制 (2) | 下一篇:两项新技术在富阳鸿茂八墅项目中.. |
点击查看关于 红树 项目 施工 阶段 成本管理 研究 的相关范文题目 | 【返回顶部】 |